AEmpresas

AYSÉN TRANSMISIÓN S.A.

WWW.AYSENTRANSMISION.CL

RUT/ID NUMBER:
76.041.891-9

GIRO COMERCIAL/LINE OF BUSINESS:
Desarrollo y administración de los sistemas de transmisión eléctrica que requiera el proyecto HidroAysén/Development and administration of the electrical transmission systems required by the HidroAysen Project

PROPIEDAD/PROPERTY:
Endesa Chile y Colbún S.A. Matriz/Parent company: Centrales Hidroeléctricas de Aysén S.A. (HidroAysén)

LA COMPAÑÍA:
Aysén Transmisión S.A. se constituyó en 2008 como una sociedad anónima cerrada, para desarrollar los sistemas de transmisión eléctrica que el proyecto HidroAysén planifica construir en los ríos Baker y Pascua, ubicados en la XI Región de Aysén. Su propuesta es transportar una energía media anual de 18.430 GWh, generada por el complejo, mediante el aprovechamiento racional de parte del potencial hidroeléctrico de ambos ríos. El trazado de la línea de corriente continua nace a 15 kilómetros al norte de Cochrane, donde recibirá la energía de las centrales hidroeléctricas del proyecto HidroAysén, en la Subestación Convertidora Sur. Desde esa zona, la energía será conducida hasta el Sistema Interconectado Central (SIC). El año 2005, la Dirección General de Aguas (DGA) resolvió denegar los derechos de agua solicitados por la empresa para el desarrollo de la planta hidroeléctrica de 2.750 MW, por razones de caudal ecológico de los ríos Baker y Pascua, así como por el Plan de Desarrollo Regional. Por lo tanto, por los próximos años, se cerraría la opción de viabilizar Hidroaysén.

THE COMPANY:
Aysen Transmision S.A. was constituted in 2008 as a closed corporation to develop the electricity transmission systems that the HidroAysen project is planning on building at the Baker and Pascua Rivers, located in the XI Aysen Region.Its proposal is to transportof a mean annual power of 18,430 GWh, generated by the complex, through the rational exploitation of the hydroelectric potential of both rivers. The tracing of the continuous power lines is born 15 kilometers north of Cochrane, where it will receive the power of the HidroAysen project’s hydroelectric power stations, in the Convertidora Sur Substation. The power will be driven from there to the Central Interconnected System (SIC). In 2005, the Water Rights Agency (DGA) decided to deny the water rights requested by the company for the development of the 2,750 MW hydroelectric plant, due to the ecological flows of the Baker and Pascua Rivers, as well as due to the Regional Development Plan. Therefore, in the next few years, the option to make HydroAysen viable would be closed.

PRINCIPALES REPRESENTANTES/MAIN REPRESENTATIVES:
Presidente del Directorio/Chairman of the Board:
Juan Eduardo Vásquez Moya

Gerente General/General Manager:
Camilo Charme Ackermann

Casa Matriz/Headquarters Alonso de Córdova 5670, Of. 201, Las Condes, Santiago, Región Metropolitana/Metropolitan Region. Teléfono/Phone (56- 2) 2379 5332
Presencia Regional/Regional Presence Cochrane y/and Coyhaique.
E-Mail contacto@hidroaysen.cl
WWW.AYSENTRANSMISION.CL

Artículos relacionados

Revisa también

Close
Close